Key points
- Deputy Chief Minister Mukesh Agnihotri lays foundation stone of a ₹5 crore Automated Testing Station in Roda on October 11.
- The facility will offer driving tests and vehicle fitness checks for various vehicle types.
- New Haroli is being developed with a helipad, synthetic track, and a soldier's building.
Deputy Chief Minister Mukesh Agnihotri lays foundation stone of a Automated Testing Station (ATS) in Roda, Haroli constituency on Sunday, October 11.
The project has a projected cost of ₹5 crore and is expected to be completed in nine months.
The ATS will feature three testing lanes for heavy, light, three-wheeler, and two-wheeler vehicles. It will provide both driving tests and vehicle fitness checks at a single location.
The Public Works Department will carry out the construction of the station.
HRTC will provide the machinery, technical equipment, control systems, software, CCTV, and related technical facilities for the station's operation.
Additionally, the area from Ramnagar Bridge to Haroli Jal Bhawan is being developed as 'New Haroli'.
Several projects are planned for the New Haroli area, including a helipad at a cost of ₹22 crore and a synthetic track costing ₹10 crore. A soldier's building will also be constructed there at a cost of ₹3.50 crore.